When installed in a hot oil system, small diameter pipe (25.4 mm or smaller), if it is threaded, should be schedule: Power Engineering Chapter 142 When installed in a hot oil system, small diameter pipe (25.4 mm or smaller), if it is threaded, should be schedule: a. 80 b. 100 c. 40 d. 120 e. 160 Answer: A Learn More : Share this Share on FacebookTweet on TwitterPlus on Google+