When installing a siphon it
a) must be perpendicular to the piping
b) must be dry
c) should be downstream of an inspectors' test connection
d) should be first filled with water
e) shall be as close
Answer: D
Power Engineering | Multiple Choice | Questions and Answers | Test bank | Chapter