One of the main purposes of an external boiler inspection is to:

One of the main purposes of an external boiler inspection is to:




a. Observe operation and maintenance practice
b. Inspect all auxiliary equipment and pressure vessels
c. Verify that scale is not present on or in the tubes
d. Check for waterside corrosion
e. Ensure only licensed operators are employed at the plant






Answer: A

When shutting down a boiler for internal cleaning, you should:

When shutting down a boiler for internal cleaning, you should:




a. Shut down the boiler, then fill it completely with chemically treated water
b. Shut off the fire, drain, open up and flush
c. Allow the boiler to cool; then drain, open up and flush it
d. Shut off the fire and flush with cold water to cool it down
e. Let it stand for a couple of days then drain





Answer: C

Before a welder is allowed to weld on a boiler he must have a

Before a welder is allowed to weld on a boiler he must have a



a) certificate of qualification
b) certain minimum number of years experience
c) performance qualification card
d) welding test conducted
e) certificate of qualification and a performance qualification card







Answer: E

When working inside a steel heating boiler, which of the following safety precautions should you take?

When working inside a steel heating boiler, which of the following safety precautions should you take?


1. boiler must be cooled and vented
2. valves must be closed and locked, and all lines to and
from the boiler must be blanked
3. you may use ungrounded wiring
4. always have one man standing outside, whenever anyone is
inside the boiler




a) 1, 2, 3
b) 2, 3
c) 2, 3, 4
d) 1, 2, 3, 4
e) 1, 2, 4




Answer: E